Abstract

In the Yangtze River Delta of China, a large number of metro tunnels have been constructed in soft soils. The excessive and differential tunnel settlement may impair the serviceability of the metro system. The treatment of such excessive and differential settlement in rheologic and sensitive soft soils is a challenge because the tunnel may incur a larger settlement due to construction disturbances. In this paper, a case study of the differential settlement treatment of the new shield tunnel of Ningbo Metro line 2 is presented. A maximum tunnel settlement of 214 mm was observed several months after construction of the tunnel was completed. To uplift the deviated tunnel axis, a grouting and lifting measure named “bottom grouting, inner support, real-time monitoring and immediate adjusting” is proposed. The settlement treatment section is successfully uplifted with an average value of 30 mm, and the maximum final uplift amount of the tunnel is 41 mm, which reached the target value of uplift. The maximum convergence deformation caused by the grouting is 10 mm, which is less than the maximum acceptable deviation, i.e., 15.5 mm. The corrective grouting method and the valuable monitoring data presented in this study can provide a reference for projects with similar problems in the future.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.