Abstract

The world experience of solving the problems of project management is generally directed to the use of the best practices. But conditions for the improvement and development of organizational structures in management of organizations and enterprises are not always created. In this study, in the context of project management theory, the structure of communication between the main entities of the process: the team, the project and its environment was generalized. The assignment of these components of the project environment to specific discrete states, in which the project system may be, enables to display the system using a Markov chain with three discrete states. The transition probabilities of the Markov chain for the project environment determine its characteristics which vary in discrete time step by step in the form of a certain set of state probabilities. Cognitive features of the model which was built on the basis of a Markov chain allows to assign specific values to the transition probabilities of the system. In this paper, a new approach for determining the values of the transition probabilities is proposed. The transition probabilities are identified with the relative time of resource cost in each of the discrete states. Using the cognitive model that was created by the interaction of the main entities of the project, namely, the team, the project and its environment, the trajectory of the projects development in the case of loyal cooperation and in the case of resistance of the project environment was studied. The received results reflect a strong growth trend of the time resource cost for system interaction with the environment of the project, which eventually will delay the implementation of the project. The obtained results do not contradict the definition of the law of S. D. Bushuev. The structure of the project management in the stage of initiation of the project includes the team, the project and environment of the project. These entities are constantly interacting with each other. The change of the state probabilities of the project fully reflects the progress and impact of the project. This new understanding of the project systems leads us to the development of modern approaches as the basis for new practices in project management.

Highlights

  • A generalization of experimental and theoretical knowledge of the processes and events in the sphere of project management appears in the models, methods, techniques and mechanisms that reflect the models of development and transformation of project systems [1]

  • We examine a hypothetical project system in the context of our hypothesis, which is based on the fact that the Markov chain has cognitive properties

  • A number of factors and conditions form a complex configuration of communications in the project system, which changes the management of the system in time

Read more

Summary

Introduction

A generalization of experimental and theoretical knowledge of the processes and events in the sphere of project management appears in the models, methods, techniques and mechanisms that reflect the models of development and transformation of project systems [1]. An existence of law allows getting a new class of data, which are studied and processed, that can be used as a basis for further research and can increase our knowledge about this class of systems [4]. Some structures that represent the algorithms of actions of the best practices can acquire the status of rules [5]. Study of the theoretical foundations of project management with the use of mathematical models is the actual direction of research, as new knowledge that focuses on solving urgent problems of practice is generated

Literature review and problem statement
Research goal and objectives
The characteristics of project activity
The basing of the law of initiation of project
The description of the system using the Markov chain
The discussion and perspectives of the further researches
Findings
Conclusions

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.