Abstract

Dam is an infrastructure that has many benefits for human survival such as a water reservoir which is the solution to the current crisis of clean water in Indonesia. The clean water crisis was anticipated by the government by constructing dam in critical areas with a target of 29 dams to be completed by 2019. But it is not uncommon for work accidents to occur in dam construction that have an impact starting from minor injuries to fatal ones such as death. So that, it is necessary to identify and analyse potential hazards early to prevent such accidents. This research aims to develop a safety plan for preparatory work of dam construction and cofferdam construction by identifying potential hazards that may occur in each work package by reviewing work methods, work activities, and WBS-based dam construction that has been standardized using the qualitative approach method. From the research, there are 20 risk sources of OHS that have the highest potential hazard in preparation work and cofferdam which were dominated by human resources and tools. Furthermore, safety plan had been developed based on the OHS risk sources obtained from the WBS for preparatory work and cofferdam.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.