Abstract

The road network in Ireland comprises national primary and national secondary roads, and non-national regional roads and local roads. Since 1994 the responsibility for the management and maintenance of the national roads has rested with the National Roads Authority (NRA). In 2001 the Eirspan bridge management system was introduced to coordinate and integrate activities such as inspections, repairs and rehabilitation work to ensure optimal management of the national road structure stock. This paper summarises the reasons for the introduction of the system and gives a review of the distinct activities included in Eirspan. It describes how bridge components are condition rated within principal inspections and outlines how, after the completion of the inventory gathering and first principal inspections, repair works are priority ranked. Future developments within Eirspan are also discussed. Eirspan helps engineers within the NRA to prioritise maintenance needs and maximise the use of available funding. It has proved to be an invaluable tool in helping to maintain the function and safety of bridges throughout the national road network in Ireland.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.