Abstract
An increased power handling of rf-beam loads is required by the development of high power gyrotrons for fusion research, as well as the achievement of full capability to work under vacuum conditions, which is imposed by the use of evacuated transmission lines. New techniques were developed at IFP/CNR, leading to two prototypes. One is capable of 1 MW CW operation, while the second one is designed for precise measurements at short-pulses (0.1 s) at higher peak power (2 MW). Preliminary tests at 140 GHz, high power and long pulse (500 kW, 10 s) were performed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.