Abstract

A new model is developed for a cascade of four hydropower reservoirs operation. The aim is to improve the total power generation from the system. Daily data of reservoir level, release and power generated which varies from 4-20 years are used for analysis. Long-term data of reservoir level and inflow are used to determine the critical period. The critical period is classified into four seasons; these are filling, depleting, upper and lower level operating season. Mathematical models are used to rank the refill and the deplete order of the reservoirs. A new rule models are presented using the results of refill and depletion ranks. Power generation using the developed model is compared to the long-term historical generated; and it is found that the new rule model boost the daily power production by 5.3% and the plant factor by 2%.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.