Abstract

The article is devoted to the problem of implementing BIM technologies for the operation of capital construction facilities. The research is relevant due to the problems that arose when transiting from traditional approaches to operation control of capital construction facilities to operation control based on the use of BIM technologies. The result of the research is the developed algorithm for implementing automation systems for operation control using BIM technologies. The implementation of the algorithm allows improving significantly the current operation systems of capital construction facilities. The algorithm distinguishes clearly the stages in their logical sequence, result, duration of each stage and the amount of costs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.