Abstract

A real-time simulator of a hydroelectric power plant is developed and implemented. The aim of the simulator is to test the speed and load control system using hardware-in-the-loop techniques, in which the control system is connected to a real time simulator instead of being connected to real equipment. The main characteristics of the process models, hardware and software, and the tools employed for development are described. The functionality of the simulator is demonstrated with an application example.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.