Abstract

Longhupao oilfield is a large medium permeability oilfield with the earliest development and the largest area in the western periphery of Daqing. It belongs to a reservoir controlled by lithology and structure. After decades of water injection development, it has entered the development stage of ultra-high water cut stage. The remaining oil is highly dispersed and it is more and more difficult to tap the potential. In order to make the later development adjustment more targeted, it is necessary to evaluate the development effect of the oilfield. Therefore, starting from the field data of the oilfield, this paper comprehensively uses mathematical formula calculation and reservoir engineering methods to evaluate various indexes such as water drive recovery rate, water injection utilization rate, oil production rate, liquid production rate and comprehensive water cut in the current development stage of Longhupao oilfield, The experience of each stage is summarized to provide reference for the formulation of development adjustment strategy in ultra-high water cut period.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.