In the second quarter of calendar year 1992, work continued on Task 1.1. ``DESIGN MODIFICATIONS TO THE 20 MMBTU/HR AIR COOLED COMBUSTOR AND BOILER COMPONENTS``. This consisted of specifying and designing the changes needed to prepare the 20 MMBtu/hr air cooled combustor at the Tampella boiler house site in Williamsport, PA. In depth review of the technical status of the combustor showed that no major design changes were necessary in order to implement the effort of task 2 testing and part of the task 3 testing. Among the major planned changes eliminated were replacement of the inlet swirl air flow section of the combustor. The major changes undertaken were to improve the coal and sorbent injection into the combustor; refurbishing various components and controls systems such as the stack particle scrubber and temperature probes; automating key elements of the combustor, such as the slag tap, upgrading the computer control and automatic data acquisition; and upgrading the long duration capability of the exit nozzle. To support this effort advanced analytical modeling was used to provide guidance for the design changes. A multi-dimensional computer code was used to analyze the combustor performance for different combustor stoichiometries and geometry. A heat transfer analysis of the exit nozzle was performed to determine the best method of adding cooling capacity to the exit nozzle to allow its use for multi-day, round-the-clock coal testing.
Submitted Version (Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have