Abstract

The basic stages and directions of upgrading and reconstruction of the power-generating units of nuclear power plants with RBMK reactors over a period of 20 yr since the Chernobyl accident are reflected in this paper. The greatest amount of work was done in 1986–1990 on all units with RBMK-1000 and-1500 reactors which were operating at that time in the USSR. The purpose of the upgrade was to improve the neutron-physical characteristics of the reactor cores, increase the response speed of the safety and control system and decrease the positive effect of water outflow from the cooling loop of this system, increase the flow capacity of the systems performing emergency discharge of the steam-gas mixture from the reactor, and improve the basic operating documentation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.