Abstract

An intersection of European Railway Corridors is present in our country by geographical meanings, conducting to a need of developing infrastructure and connecting it to the European Corridors. The railway link between the Romanian Regions is developing and has just a few sections that need to be made in order to have the entire IVth Pan European Railway Corridor from Romania rehabilitated. The Central Developing Region from Romania contains the railway section between Brasov and Sighisoara cities that is rehabilitated for the maxim design speed for passenger trains of 160 km/h and 120km/h for freight trains. The maximum design speed imposes new curves with bigger radius resulting in new routes along the section. The actual and proposed route of double track railway section between Brasov and Sighisoara is analysed and the rehabilitation works along with it. The tunnels cross section and possible difficulties in realising and execution of them are presented and analysed. Conclusions regarding the proposed art works and future problems that can be solved in this stage – preparation stage that can assure better and safe construction and exploitation of the railway are made in final.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.