Abstract

ABSTRACT In recognition of deeper insights into the implications of wind farm deployments, this paper addresses the need for an updated Life Cycle Assessment (LCA) for onshore wind generation systems, using 4.3 MW wind turbines and direct drive permanent magnet synchronous generators. The environmental and energy performances were estimated through an LCA for an onshore wind plant under construction in Aotearoa New Zealand with a total nameplate capacity of 176 MW. This study used real construction data showing literature data overestimates civil works and underestimates transportation contributions in the wind farm footprint. Further, different end-of-life management alternatives for turbine blades are analysed: landfill, mechanical recycling, and chemical recycling. The results indicate a carbon footprint of 10.8–9.7 gCO2eq/kWh, a greenhouse gas payback time of 1.5–1.7 years for avoided combined cycle gas turbines, and an energy payback time of 0.4–0.5 years, in which the chemical recycling of the blades is the lower emission solution overall. The outcomes underscore the environmental efficiency of onshore wind farms and their important role in the energy transition. Notably, the manufacturing of wind turbines is the primary contributor to the carbon and energy footprints, highlighting a critical area for targeted environmental mitigation strategies.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call