Abstract
Traditional methods have limitations in achieving precise predictions of risk occurrence at an exact future time and have difficulties transforming between qualitative and quantitative indicators and handling multi-source heterogeneous risk data. This study quantifies and analyzes the multi-source construction safety risks classified into the categories of man, machine, material, method and environment (4M1E), and presents a cloud evidence method that integrates wavelet de-noising algorithm, cloud model, and Dempster-Shafer (D-S) evidence theory. A real-time risk prediction and warning is provided using this method after the fusion of multi-source uncertain information and the transformation between qualitative and quantitative indicators, enabling the timely detection of potential risks for project managers. This method analyzing “uncertainty” with “certainty” is verified by an undersea tunnel construction project. The result shows that this method is effective in early warning risks two days before their actual occurrence, providing reference significance for risk early warning of the tunnel construction project.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.