Abstract

Population growth and development of economic relations have led to increase utilization of transportation infrastructures. The bridge is one of the important components of road construction that always needs special attention during the whole period of design, execution and operation. To ensure that the stairs are regularly inspected, evaluated and operated, management is needed to meet this need in the stairs by performing appropriate maintenance and repairs. Therefore, in this study, a three-objective optimization model includes minimization of maintenance costs, maximization of bridge performance index and reliability of bridges. For this purpose, a complex integer mathematical programming model has been developed. In order to solve the problem, a multi-objective particle mass optimization algorithm has been developed. From the solution of the proposed algorithm, different Pareto answers are obtained so that the decision makers can choose the answer from the obtained Pareto answers that is their priority.Also, after performing a sensitivity analysis on the parameters of failure rate and failure rate during the effect, it has been observed that by increasing the scenario number in two cases, which indicates an increase in failure rate and failure rate during the effect, the amount of costs increases and The overall performance of the system has been declining, which seems natural and correct.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.