Abstract

Solar is a promising renewable energy source for Indonesia's increasing electricity demand, which grows at the rate of 3.3% annually. However, high investment costs and unclear policies hinder Solar Power Plant (SPP) development. Considering the potential for growth in energy demand and the low long-term operational costs, it is imperative to foster SPP expansion in Indonesia. This study aims to identify location criteria and potential SPP development sites in Indonesia. We employ Multi-Criteria Decision-Making (MCDM) combining Fuzzy-AHP and Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) methodologies to assign criteria weights and prioritize alternative SPP locations. Results show that, from all respondents using the geometric mean in the Fuzzy Analytic Hierarchy Process (AHP), it is found that the Economic criteria give the highest weight at 31%, and subcriteria of Land Availability, Peak Sun Hours, Geographic Location, Distance from Transportation Networks, Construction Costs, and Government Regulations contribute significantly. The ranking of alternative solutions indicates that South Sumatra Province holds the highest priority for SPP development with a 0.572 score, closely followed by North Sumatra at 0.571

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.