Abstract

The complexity of construction projects increases the likelihood of hazards affecting their successful implementation. There are many risk factors that lead to the failure of the project. These factors should be identified and ordered both because of their degree of importance (significance) and level (volume) of a given factors. This is very important in order to determine their effect on the construction project. Typically, the threats for the construction project include the extension of the project duration, the increase of the project cost and/or the reduce of the quality of the works. This article aims (1) to identify risk factors that may affect the construction project in Poland in the above-mentioned aspects and (2) to prioritize the significance of those risk factors. Due to the uniqueness of individual construction projects, the potential hazards and their effects are usually characterized by different levels of uncertainty. Unfortunately, it is often a non-statistical uncertainty. For this reason, the degree of significance of risk factors is described and modelled using linguistic variables and elements of the theory of fuzzy sets. This method allows to evaluate the risk of construction projects prior to their implementation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.