Abstract

This study deals with the case study on the pallet quantity determination problem for the flexible manufacturing system producing 32 different types of aircraft wing ribs which are major structures of an aircraft wings. A Korean company has constructed the WFMS (wing rib flexible manufacturing system) that is composed of several automated equipments such as the 5-axis machining centers, the RGV (rail guided vehicles)s, the AS/RS (automated storage and retrieval system), the loading/unloading stations, and so on. Pallets play a critical role in the WFMS to maintain high system utilization and continuous work flow between 5-axis machining machines and automated material handling devices. The discrete event simulation method is used to evaluate the performance of the WFMS under various pallet mix alternatives for wing rib manufacturing processes. Four performance measures including system utilization, throughput, lead-time and work in process inventory level are investigated to determine the best pallet mix alternative. The best pallet mix identified by the simulation study is adopted in setting up and operating a real Korean aircraft parts manufacturing shop. By comparing the real WFMS’s performances with those of the simulation study, we discussed the cause of performance difference observed and the necessity of developing the CPS (cyber physical system).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.