Abstract

The methodology for determining the optimal start-up lot in the machine tool system for small and medium¬sized engineering enterprises is considered. The methodology based on a multi-product network, the Ford-Fulker- son algorithm and the developed integer-valued linear programming task is considered. Keywords: launch party; capacity determination task; Ford—Fulkerson algorithm; mathematical model; methodology for determining the optimal launch batch.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call