Abstract

This report presents the methods and calculated results of the activity inventory in the structural components of the Dalat Nuclear Research Reactor (DNRR). These components include the shielding concrete, the reactor tank, and its inside irradiated facilities; the thermal and thermalizing columns; and the horizontal channels. The MCNP5 code with a three-dimensional neutron transport model was used to calculate the neutron flux distribution, neutron energy spectrum at different locations, and activation cross sections of long-lived radioactive nuclides in activated major materials, including heavy concrete, reflection graphite, and aluminum of the reactor. The calculated results of the energy spectrum and activation cross sections of MCNP5 were used in the ORIGEN2.1 point depletion code to calculate the neutron-induced activity of activated materials at different time points by modeling the irradiation history and radioactive decay. Radioactivity of long-lived key activation products such as 41Ca, 60Co, 55Fe, 63Ni, and 152Eu was modeled, and volumes of radioactive waste mainly of ordinary concrete, graphite, and aluminum in the structural components of the reactor were estimated. Experimental results of neutron flux and specific activities of some typical nuclides such as 60Co, 152Eu, 55Fe, and 63Ni in activated aluminum samples showed good agreement with the calculated results. As part of the national regulation requirements, the obtained data have been used to develop the decommissioning plan for the operational DNRR, with an estimation of about 10 years before its permanent shutdown.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.