Abstract

The objectives of the perfect power project include: (1) the achievement of system-wide perfect power and demonstration of its technological viability; (2) 50% peak demand reduction capability via on-site generation when called upon by ComEd/ PJM; (3) deferral of ComEd planned substation upgrades due to the demand reduction achieved; (4) demonstration of the economic value of perfect power, specifically the avoidance of outage costs and the introduction of significant savings and revenue from providing ancillary services; and (5) a design that can be replicated to any municipality-sized system where customers can participate in electric power market opportunities. Transforming the IIT power delivery infrastructure to achieve perfect power is a bold idea that will require a never-ending series of innovations. We have embraced the vision of the GEI and we look forward to sharing our progress with the power and energy community in the years to come.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.