Abstract

The measurement of workload is carried out to determine the amount of burden on a position through job description. Before determining the number of man power, it is necessary to measure the workload for a certain position. The method commonly used is the Full Time Equivalent (FTE) method. The FTE method is used to calculate workloads with various task variations. The case study is ABC, a machine maintenance service company. As a company engaged in the service sector, having high quality and proportional number of human resources (HR) is important in order to provide the best service for customers. For this reason, an application is needed that can support FTE calculations. The purpose of this study was to find out the number of employees by calculating workloads based on the Java-based FTE method. The design of this application is done using the System Development Life Cycle (SDLC) approach. The design of this application starts from the stage of analysis, design, coding, testing, and maintenance. Functional needs refer to the HR division as user and administrator. The research findings to facilitate the relevant divisions or decision maker to add personnel or reduce them using the application.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.