Abstract

A new 100m underground HTS cable system was planned for an experimental study in a real scale. The main targets of the project were the verification of the system application. Various types and multipoint analogue data including digital control sequence data were required to be measured. Because of the long operating period of the system cooling and warming sequence, very high operating stability was required. Additionally the economically designed main cooling facility was requested over-night manual operation. The basic function of the data acquisition and control system was the gathering of various type data and the control of test facilities include the cooling facility. Most effort of the design procedure was focused on making the automatic operation including under an emergency situation and the alerting of the emergency state to the operators staying even remote place. The main focus of this function was reducing of the operating man power, specially requested for over-night. So various emergency situations and scenarios were considered and analyzed for the automation operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.