Abstract

Abstract This paper presents the optimization process of a grid connected photovoltaic (PV) system, which is intended to replace a large-scale thermal solar system on the rooftop of a Federal office building. A PV energy conversion model is described. Based on this model, array surface tilt angle and array size are optimized. The optimization method is based on maximizing the utilization of the array output energy, and, at the same time, minimizing the electricity power sold to grid. An effectiveness factor is introduced that takes into account both of these parameters. The array configuration and the output parameters are determined by comparing several PV modules. A 43.2 kW PV system is designed and operational problems such as harmonic effects and anti-islanding are discussed. Finally, the system performance is simulated and through economic analysis it has shown that the cost of PV system can be recouped in 13 years under the current renewable energy incentive program by the state of Illinois.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call