Abstract

Advances in engineering solutions in recent few decades caused that conventional fatigue limit (for steels and cast irons given for number of 107 cycles) is no more sufficient. Construction parts of newly introduced transport vehicles, operating at high velocities and at long distances, reach during their lifetime very high numbers of loading cycles, in order of 109. For this reason, values of fatigue limits for 109 cycles must be considered in design and construction of transport vehicles. In this study, authors present how dramatically will change the design of shaft, when fatigue limit for 109 cycles is considered.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.