Abstract

Abstract The paper presents the method for design of primary roof support for the large todoidal cavern constructed to house the Sydney Opera House parking station. The cavern was constructed with 7 m of rock cover beneath Sydney's Royal Botanic Gardens. Design of rock reinforcement using a combination of fully grouted rock dowels and Macalloy bars was based on control of horizontal shear movement along bedding features in the roof. A combination of linear-arch-type analyses and non-linear jointed finite-element analyses were used in the design study, together with an analysis of the shear resistance offered by fully grouted bolts under shear deformation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.