Abstract
Double-water tank is simulated by using hardware-in-loop simulation platform in this design. Semi-physical simulation is realized by the computer, SIMULINK and using QuaRC. On this basis, the monitoring operating of double-water tank can be realized by PLC. First the controlled object is analyzed the model to build the physics model on SIMULINK, communicate with PLC by means of data sampling module and monitor the change of liquid level by WinCC configuration software, design and build remote computer process control system, complete control system experiment result analysis.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: DEStech Transactions on Engineering and Technology Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.