Abstract

Gamma charts for time between events are very useful in the high‐quality processes, which monitor the time until the rth event. The average time to signal (ATS) is adopted to evaluate the performance of Gamma charts, because it reflects both the number and the sampling interval of samples inspected until an out‐of‐control signal occurs. An ATS‐unbiased design for Gamma charts with known parameters is proposed based on the hypothesis test of the scale parameter. For the phase I monitoring, a new ATS‐unbiased design with unknown parameters is developed, and a sequential sampling scheme is adopted to start process monitoring as soon as possible. Some specific guidelines to stop updating the control limits are suggested from the convergence of the width between control limits with different phase I sample sizes. Finally, a real example is illustrated to demonstrate the implementation of the proposed approach. Copyright © 2015 John Wiley & Sons, Ltd.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.