Abstract

Exponential charts based on time-between-events (TBE) data are widely investigated and applied in various fields. The average time to signal (ATS) is used instead of the average run length to evaluate the performance of TBE charts, since the ATS involves both the number and the time of samples inspected until a signal occurs. An ATS-unbiased exponential control chart is proposed when the in-control parameter is known. Considering the need in practice to start monitoring a production process as soon as possible, a sequential sampling scheme is adopted and the in-control parameter is estimated by an unbiased and consistent estimator. Some specific guidelines to stop updating control limits are obtained from the relationship between the phase I sample size and the actual false alarm rate. Finally, two real examples are given to illustrate the implementation and efficiency of the proposed method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.