Abstract

GIS is getting more attention in the application of electric power system. This article mainly focuses on the electric GIS system based on the practical need in the electric system. This electric GIS system is composed of three subsidiary systems, among which PDA may transfer data collected by the inspectors to GIS general management and control system through GPRS, design the Geodatabase and system functional modules which accessed by multiple users simultaneously with C/S model, to achieve the automation in the information sharing and collaborative work.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.