Abstract
In smart grid, advanced metering infrastructure (AMI) is an important task for predicting the power consumption such that the balance of supply and demand in power market can be achieved. For designing a good communication infrastructure for the smart meters, it is necessary to study the short term power consumption pattern which is equivalent to the information source pattern in communication systems. To design a system to reduce the power consumption for individual users in scheduled duration Instead of power cuts there will be a scheduled restricted power supply. We implement GSM based remote controlling station from where we send control information consist maximum power consumption and restriction period. If the consumers uses more power than the allowed power, after a warning the system will shut down the power supply automatically.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have