Abstract

The notion of boiling water within a reactor core and sending the steam directly to a turbine-generator was investigated by Argonne National Laboratory in the late 1940's and early 1950's. Following the success of boiling reactor tests, the General Electric Company signed a contract with the Commonwealth Edison Company of Chicago, Illinois, in 1955 to deliver the 180 MW(e) Dresden Nuclear Station (Unit 1). Experience with several Generation I design configurations led to a series of Generation II product evolutions for direct-cycle Boiling Water Reactors that became deployed worldwide, with improvements developed in the US, Europe and Japan. International cooperative efforts have led to today's Generation III/III+ designs with improvements in safety, operation and maintenance, construction and economics. The Boiling Water Reactor is well positioned to serve in conjunction with the current operational fleet as well as emerging Generation IV reactor designs of the future.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.