Abstract

The Max-Planck-Institut fÜr Plasmaphysik is building the stellarator fusion experiment WENDELSTEIN 7-X (W7-X) at the branch institute in Greifswald, Germany. The 50 non-planar superconducting coils are currently manufactured by industry and use a specially developed NbTi cable-in-conduit conductor. The manufacture of the coils includes the conductor, winding of the conductor, vacuum pressure impregnation as well the embedding of the winding pack into a cast steel casing, the final machining and the installation of the helium cooling system on the casing. Design changes became necessary during production in the connection areas of the casings due to more detailed design and structural analysis. In addition, the insulation and the welds in the termination area need to be improved. New quench detection cables were qualified. LINAC inspections allowed to check the presence of casting defects in the thick casings. Additionally high voltage tests in vacuum under Paschen-minimum conditions turned out to be a very sensitive inspection method to check the integrity of the electrical insulation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.