Abstract

The superconducting dipole magnets of the Large Hadron Collider operate in a superfluid helium bath at 1.9 K. As a part of the magnet quench protection system, each dipole magnet is equipped with a bypass diode located in the helium bath. The connection between the superconducting magnet and the cold by-pass diode is made through a clamping system called “half-moon,” located at the lowest point of the cold-masses. This area is prone to receiving metallic debris residual from the assembly technological processes. The metallic debris might move and create an earth fault during helium flows that occur not only during the cool-down, warm-up, and flushing of the cryogenic installation but also during magnet quenches at high currents. In case of appearance, the earth fault is detected by the protection system of the circuit and as a consequence, the current is ramped down to zero. Subsequently, with the circuit current already at zero, the fault can be eliminated using a device denominated as the Earth Fault Burner. The fault elimination must follow a strict procedure as it is not fully risk-free. This paper describes the details of such earth fault elimination, including preliminary diagnostics and necessary hardware. Two examples from the LHC operation are described and discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.