Abstract
With the continuous development of China's economy, China's energy consumption increases, and the problem of energy shortage becomes more and more obvious. Today, with the increasingly serious global energy crisis and the increasing awareness of environmental protection and energy conservation, people are beginning to realize that the impact of large data centers on the environment can not be ignored. In order to maximize energy utilization, green energy conservation has become the goal of current data center construction, and green data center has become the core concept of current data center construction. Based on this, this paper builds the system model of the new green data center, and designs and implements the task scheduling strategy in the data center. At the same time, in order to eliminate the extra overhead caused by task migration, this paper uses the dynamic load forecasting method to forecast the data center load intensity in a short time, so as to determine the best time for the load to switch between servers. Experimental results show that the accuracy of this algorithm is high, and the scheduling effectiveness can reach 95.14%. In this paper, the design and practice of high energy-saving and high reliability green data center construction scheme has certain practical significance, in order to provide some reference for related research.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have