Abstract

AbstractThe Midwest Geological Sequestration Consortium, one of seven US Department of Energy Regional Sequestration Partnerships, began a large‐scale injection of 1000 tonnes (metric tons) per day of carbon dioxide (CO2) at the Archer Daniels Midland (ADM) facility in Decatur, Illinois, in November 2011. This project is also known as the Illinois Basin – Decatur Project (IBDP). Trimeric Corporation had process engineering design responsibility for the compression and dehydration facility that is used to take atmospheric pressure CO2 from the ADM ethanol fermentation process and deliver dehydrated, supercritical CO2 to the injection well. An overview of the project design basis and the requirements that led to the selected process design is presented. An explanation of the equipment selection process is provided. An overall system design review including the multistage centrifugal blower, reciprocating compressors, triethylene‐glycol dehydration system, multistage centrifugal pump, and the pipeline is presented. Lessons learned during commissioning, startup, and operations are discussed. Future project concerns are discussed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call