Abstract

The paper describes the first super-critical once-through boiler to be installed in Great Britain. The unit is designed as a topping installation working in conjunction with a back pressure turbine exhausting into a medium pressure steam system Reasons for the choice of critical pressure are given, followed by a note on the fuels used and their effect on design. The boiler and its auxiliary plant are then described together with the control system; a note is included on feed water The operation of the boiler, including the method of starting up and shutting down, as well as some difficulties with tube faults, is described The paper concludes with a statement that the boiler has fulfilled its purpose since it is extremely flexible in response to load changes, and is also capable of operation below the designed pressure and temperature, if required to do so.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.