Abstract

Senoro Gas Development Project is one part of a joint project between Pertamina and Medco E&P in the field of oil and gas exploration, located in Central Sulawesi, Indonesia. Senoro gas field built a jetty as berthing facility with length around 500 m from the shore. Based on the survey results showed that significant wave height is 2.7 m height at jetty area, while the requirement for vessel berthing larger than 50.000DWT is 0.7 to 1.5 m. Therefore, pile breakwater was planning to build in Senoro jetty area to protect and to reduce the wave height. From bathymetry data shows that the water depth in front of the jetty is between 20-30m. In this case, breakwater conventional or rubble mound type will not be effective for this depth. Thus, pile breakwater is one of the solutions as protection structures for protecting the jetty area from wave attack. The objective of this study is to modeling the performance of pile breakwater to reduce wave height with numerical model. For this study, analysis of the performance of the breakwater is done with numerical model of computational fluid dynamic analysis. The results indicated that pile breakwater was able to reduce the wave height for safety berthing requirement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.