Abstract

This paper describes the construction of the Sentosa Integrated Resort Development in Sinngapore which is one of the major developments to attract visitors all over the world. The first phrase of the Development is completed within 3 years through the use of precast concrete and steel construction. Moreover, heavy mega steel trusses are fabricated with Chinese steel materials, and the entire fabrication, transportation and erection process is found to be highly successful through implementation of quality assurance management systems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.