Abstract

The implementation of the design and build method in the Phase II Pal Nol Monument construction project, managed by the Public Works and Spatial Planning Agency (PUPR) of South Kalimantan Province, aims to analyze the risks associated with the design and construction processes. This project, which utilizes an integrated design and build construction method (multi-year), is located on Jl. Dharma Praja within the South Kalimantan Provincial Office Area and executed by the contractor KSO ADHI-PUTRA. A comprehensive risk mitigation strategy for the project includes detailed work planning, effective coordination, periodic evaluation, a thorough understanding of design specifications, continuous risk analysis, flexible contingency plans, and strong communication with government entities and stakeholders. Keywords: Risk Analysis, Design and Build, Construction, Tugu PAL 0 Stage II

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.