Abstract
For the cut and cover section of "framework + arch” modular structure of Xiamen Airport Road Project. Based on tunnel design section and other construction, technical requirements, we designed a 24.7 meters long and 13.5 meters wide framework loop wheel, with three rows of columns and complex structure and large cross section. In order to prevent to happen bias, two formwork loop wheel machines are symmetrical constructed.For the difference between outer ramp and main line, methods of filling soil and lengthening pillar are used. In order to reduce the load of the roof frame , scaffolding are installed. Obtained through the project monitoring, framework loop wheel machine meets the security requirements, and can improve construction speed and quality.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.