Abstract
According to the actual requirements, it is necessary to design a line connecting the 150MW hydropower station and the 230KV hydropower station. The first is to plan the overall process of the project, by consulting the data, objectively evaluating the transmission line parameters, combining Matlab and Excel to calculate the transmission line parameters, including barrier current calculation and safety analysis, and finally combining power system simulation and cost calculation, the only one is selected from hundreds of scenarios. Rationale, power flow analysis, and power loss analysis are used to evaluate transmission lines, including series reactors and new transmission lines in parallel. The process reflects the continuous refinement of the initial design to create a transmission line that is both economical and safe.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.