Abstract
This study has been undertaken to investigate and estimate design needs and propose optimum solution for lifting facility, and detailed calculation for lifting facility at Water Treatment Plant. Prior to decide optimum solution for the problem, evaluation of design concept has been done through various steps. Function decomposition and identification of individual function of the each subsystem, internal and external search for creating solution domain, next, best optimum solution has been selected via logical approach which was pairwise comparison and weighted decision matrix, and detailed calculation is performed as final step of the research.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Innovative Science and Research Technology (IJISRT)
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.