Abstract
Advanced pressurized water reactor was simulated using system analysis program. The depressurization strategy for the automatic depressurization system (ADS) under typical ADS-triggering accidents (2-inch/10-inch cold leg break, inadvertent opening of the ADS, DVI pipeline break) was investigated. The results show that after these accidents, ADS can ensure the operation of the three types of safe injection tanks, with high redundancy and inherent safety. The multi-stage design of ADS aids the sparger in maintaining a stable critical jet state. In 10-inch cold leg break accident, the sparger cannot reached the critical jet state under all of pipeline fault conditions. From a system point of view, adjusting the pipeline design of ADS is necessary to avoid long-term condensation oscillation of the sparger in some accidents. From a design perspective of the local equipment, the nozzle structure of the sparger should attenuate the dynamic load caused by the condensation oscillation and back-attack phenomenon.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have