Abstract

Performance optimization is an important goal for High-level Synthesis (HLS). Existing HLS scheduling algorithms are all based on Control and Data Flow Graph (CDFG) and will schedule basic blocks in sequential order. Our study shows that the sequential scheduling order of basic blocks is a big limiting factor for achievable circuit performance. In this article, we propose a Dependency Graph (DG) with two important properties for scheduling. First, DG is a directed acyclic graph. Thus, no loop breaking heuristic is needed for scheduling. Second, DG can be used to identify the exact instruction parallelism. Our experiment shows that DG can lead to 76% instruction parallelism increase over CDFG. Based on DG, we propose a bottom-up scheduling algorithm to achieve much higher instruction parallelism than existing algorithms. Hierarchical state transition graph with guard conditions is proposed for efficient implementation of such high parallelism scheduling. Our experimental results show that our DG-based HLS algorithm can outperform the CDFG-based LegUp and the state-of-the-art industrial tool Vivado HLS by 2.88× and 1.29× on circuit latency, respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.