Abstract

For the underpass railway large-section box culvert jacking and pipe jacking project, the key to ensuring the normal operation of the existing railway is to maintain the smoothness and stability of the track, railway settlement monitoring and line reinforcement, and box culvert and pipe culvert attitude control are the keys to solving this problem. Taking the Beijing-Harbin high-speed railway project under a city road in Beijing as an example, the law of railway track settlement during the implementation of box culvert jacking was analyzed according to real-time monitoring data. The monitoring results show that accelerating the pouring of the bedding and grouting and strengthening the railway subgrade on both sides of the foundation pit can effectively control the settlement of the railway subgrade and reduce the impact of subsequent construction on the railway, and the line renovation and secondary grouting reinforcement can effectively improve the smoothness of the railway. Combined with the comparative analysis of numerical simulation results, the necessity of line refurbishment and rail fastening combination reinforcement in actual construction is verified.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.