Abstract

The article presents the results of the analysis and calculations of the ventilation network of the decommissioned hard coal mine Y for the model of its target operation. After the end of hard coal mining and the liquidation of most of the mining excavations, the former Y hard coal mine will become an element of the drainage system and a protection for other, still active mining plants. In order for the Y excavation to be transformed into a mine water pumping station, its ventilation system should be rebuilt, and new parameters of the main fan should be determined for a smaller network of mining excavations. For this purpose, using the AERO-2016D program by POK “Zachód” Spółka z o.o., the parameters of the ventilation network were simulated in the target model of mine Y after the liquidation of the “Southern” shaft and mining excavations at levels 530m and 660m. The results of the simulation made it possible to select the optimal main fans for the target model of the transformed mine Y.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call