Abstract

AbstractThe NEEM deep ice-core drilling in northwest Greenland was completed in summer 2010 after three seasons, which included establishing all drilling infrastructure. Normal drilling operations in the main borehole were declared terminated at 2537.36 m below the surface, when further penetration was stopped by a stone embedded in the ice in the path of the drill head. The design and implementation of the drilling operation strongly resembled the NGRIP drilling program. The NEEM drill was an extended version of the Hans Tausen (HT) drill, with specific modifications to optimize its use with the highly viscous Estisol-240/Coasol drill fluid used at NEEM. Modification to the drill and its performance in the new drilling fluid was largely satisfactory and successful. Throughout the drilling, special consideration was given to the way chips were transported and collected in a new chip chamber, including the consequences of drilling a larger borehole diameter than with previous drill operations that used the HT family of drills. The problems normally associated with warm ice drilling near the base of an ice sheet were largely absent at NEEM.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.