Abstract

We present decomposition procedures for scheduling semiconductor testing facilities. These facilities are characterized by the presence of different types of work centers, some of which have sequence-dependent setup times and some parallel identical machines. We exploit the structure of the routings in semiconductor testing to develop tailored decomposition procedures that decompose the shop into a number of work centers that are scheduled using specialized procedures. Extensive computational experiments show that these procedures significantly outperform existing methods in reasonable CPU times. These results indicate that decomposition methods can be successfully applied to complex scheduling problems of the type addressed in this paper, as well as the classical job shop problems addressed in previous research.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.