Abstract

The deckle method of the buildings and embedded structures erection in confined spaces of urban development is dwelt upon. The structural and technological characteristics and combined methods of the works performance when erecting the under- and aboveground parts of buildings according to the closed and semi-closed technologies are described. The fundamental principles on the technological processes optimization are developed: piles installation, ditch sheeting using the method "diaphragm wall", soil excavation under floorings and their erection in terms of maximum saturation with the mechanical aids and continuous organization of works performance. The primary advantages and a complex of the organizational-technological solutions for this technology implementation are described.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.